location redirect
This is a demo of a seamless insert of an Icecat LIVE product data-sheet in your website. Imagine that this responsive data-sheet is included in the product page of your webshop. How to integrate Icecat LIVE JavaScript.
full icecat

Microsoft Project Standard 2016 Manajemen proyek 1 license(s)

Brand:
The general trademark of a manufacturer by which the consumer knows its products. A manufacturer can have multiple brand names. Some manufacturers license their brand names to other producers.
Microsoft Check ‘Microsoft’ global rank
Product name:
Product name is a brand's identification of a product, often a model name, but not totally unique as it can include some product variants. Product name is a key part of the Icecat product title on a product data-sheet.
Project Standard 2016
Product code:
The brand's unique identifier for a product. Multiple product codes can be mapped to one mother product code if the specifications are identical. We map away wrong codes or sometimes logistic variants.
Z9V-00342 show
Show alternative article codes used in the online market place
GTIN (EAN/UPC):
European Article Number (EAN) and Universal Product Code (UPC) are better known as the barcode on a product's packaging to uniquely identify a product in a shop or logistic process. One product can have multiple barcodes depending on logistic variations such as packaging or country.
0885370991215 show
Icecat Product ID:
The Icecat Product ID is the unique Icecat number identifying a product in Icecat. This number is used to retrieve or push data regarding a product's datasheet. Click the number to copy the link.
Data-sheet quality: created/standardized by Icecat
The quality of the data-sheets can be on several levels:
only logistic data imported: we have only basic data imported from a supplier, a data-sheet is not yet created by an editor.
created by   Microsoft: a data-sheet is imported from an official source from a manufacturer. But the data-sheet is not yet standardized by an Icecat editor.
created/standardized by Icecat: the data-sheet is created or standardized by an Icecat editor.
Product views: 64970
This statistic is based on the 97136 using ecommerce sites (eshops, distributors, comparison sites, ecommerce ASPs, purchase systems, etc) downloading this Icecat data-sheet since Only sponsoring brands are included in the free Open Icecat content distribution as used by 94642 free Open Icecat users.
Info modified on: 14 Mar 2024 17:56:45
The date of the most recent change of the data-sheet in Icecat's system
Bullet Points Microsoft Project Standard 2016 Manajemen proyek 1 license(s)
Each of several items in a list, preceded by a bullet symbol for emphasis.
:
  • - Manajemen proyek
  • - Versi bahasa: Multi bahasa
  • - Jenis perangkat lunak: Electronic Software Download (ESD)
  • - 1 license(s)
More>>>
Short summary description Microsoft Project Standard 2016 Manajemen proyek 1 license(s):
This short summary of the Microsoft Project Standard 2016 Manajemen proyek 1 license(s) data-sheet is auto-generated and uses the product title and the first six key specs.

Microsoft Project Standard 2016, Manajemen proyek, Multi bahasa, 1 license(s), Electronic Software Download (ESD), Windows 7 / 8 / 8.1 / 10 Windows Server 2008 R2 / Server 2012, 1GHz

Long summary description Microsoft Project Standard 2016 Manajemen proyek 1 license(s):
This is an auto-generated long summary of Microsoft Project Standard 2016 Manajemen proyek 1 license(s) based on the first three specs of the first five spec groups.

Microsoft Project Standard 2016. Tipe: Manajemen proyek, Versi bahasa: Multi bahasa, Jumlah lisensi: 1 license(s). Sistem operasi yang kompatibel: Windows 7 / 8 / 8.1 / 10 Windows Server 2008 R2 / Server 2012, Prosesor minimal: 1GHz, RAM minimal: 1024 MB

Country Distributor
Deutschland 1 distributor(s)
Danmark 1 distributor(s)
Sverige 1 distributor(s)
Norway 1 distributor(s)
United Kingdom 1 distributor(s)